A case study of local integrated resource planning

Arif S. Malik*, Cecilio U. Sumaoy

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

6 Citations (Scopus)

Abstract

This paper reports the results of a local integrated resource planning (LIRP) study conducted for the Philippines. Based on the investment plans for serving loads at distribution feeders our key finding is that distributed resources (DR) are cost effective alternatives to supply capacity expansion for Cagayan Electric Power and Light Co. (CEPALCO), an investor-owned power distribution utility company operating in the Southern Philippines. The total cost savings for the selected feeder on which LIRP was performed are about 19 million Pesos (about half a million US dollars, 1998) over a 10-year period.

Original languageEnglish
Pages (from-to)711-720
Number of pages10
JournalEnergy
Volume28
Issue number7
DOIs
Publication statusPublished - Jun 2003

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Building and Construction
  • Pollution
  • Mechanical Engineering
  • Industrial and Manufacturing Engineering
  • Electrical and Electronic Engineering

Fingerprint

Dive into the research topics of 'A case study of local integrated resource planning'. Together they form a unique fingerprint.

Cite this