A case study of local integrated resource planning

Arif S. Malik, Cecilio U. Sumaoy

Research output: Contribution to journalArticle

6 Citations (Scopus)

Abstract

This paper reports the results of a local integrated resource planning (LIRP) study conducted for the Philippines. Based on the investment plans for serving loads at distribution feeders our key finding is that distributed resources (DR) are cost effective alternatives to supply capacity expansion for Cagayan Electric Power and Light Co. (CEPALCO), an investor-owned power distribution utility company operating in the Southern Philippines. The total cost savings for the selected feeder on which LIRP was performed are about 19 million Pesos (about half a million US dollars, 1998) over a 10-year period.

Original languageEnglish
Pages (from-to)711-720
Number of pages10
JournalEnergy
Volume28
Issue number7
DOIs
Publication statusPublished - Jun 2003

Fingerprint

Planning
Costs
Industry

ASJC Scopus subject areas

  • Energy(all)
  • Energy Engineering and Power Technology
  • Fuel Technology
  • Nuclear Energy and Engineering
  • Renewable Energy, Sustainability and the Environment

Cite this

A case study of local integrated resource planning. / Malik, Arif S.; Sumaoy, Cecilio U.

In: Energy, Vol. 28, No. 7, 06.2003, p. 711-720.

Research output: Contribution to journalArticle

Malik, Arif S. ; Sumaoy, Cecilio U. / A case study of local integrated resource planning. In: Energy. 2003 ; Vol. 28, No. 7. pp. 711-720.
@article{db08f4cff2784d03b64f9d72c994f108,
title = "A case study of local integrated resource planning",
abstract = "This paper reports the results of a local integrated resource planning (LIRP) study conducted for the Philippines. Based on the investment plans for serving loads at distribution feeders our key finding is that distributed resources (DR) are cost effective alternatives to supply capacity expansion for Cagayan Electric Power and Light Co. (CEPALCO), an investor-owned power distribution utility company operating in the Southern Philippines. The total cost savings for the selected feeder on which LIRP was performed are about 19 million Pesos (about half a million US dollars, 1998) over a 10-year period.",
author = "Malik, {Arif S.} and Sumaoy, {Cecilio U.}",
year = "2003",
month = "6",
doi = "10.1016/S0360-5442(03)00003-3",
language = "English",
volume = "28",
pages = "711--720",
journal = "Energy",
issn = "0360-5442",
publisher = "Elsevier Limited",
number = "7",

}

TY - JOUR

T1 - A case study of local integrated resource planning

AU - Malik, Arif S.

AU - Sumaoy, Cecilio U.

PY - 2003/6

Y1 - 2003/6

N2 - This paper reports the results of a local integrated resource planning (LIRP) study conducted for the Philippines. Based on the investment plans for serving loads at distribution feeders our key finding is that distributed resources (DR) are cost effective alternatives to supply capacity expansion for Cagayan Electric Power and Light Co. (CEPALCO), an investor-owned power distribution utility company operating in the Southern Philippines. The total cost savings for the selected feeder on which LIRP was performed are about 19 million Pesos (about half a million US dollars, 1998) over a 10-year period.

AB - This paper reports the results of a local integrated resource planning (LIRP) study conducted for the Philippines. Based on the investment plans for serving loads at distribution feeders our key finding is that distributed resources (DR) are cost effective alternatives to supply capacity expansion for Cagayan Electric Power and Light Co. (CEPALCO), an investor-owned power distribution utility company operating in the Southern Philippines. The total cost savings for the selected feeder on which LIRP was performed are about 19 million Pesos (about half a million US dollars, 1998) over a 10-year period.

UR - http://www.scopus.com/inward/record.url?scp=0037409178&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=0037409178&partnerID=8YFLogxK

U2 - 10.1016/S0360-5442(03)00003-3

DO - 10.1016/S0360-5442(03)00003-3

M3 - Article

VL - 28

SP - 711

EP - 720

JO - Energy

JF - Energy

SN - 0360-5442

IS - 7

ER -