Scheduling in a three-machine flexible robotic cell

Hakan Gultekin*, M. Selim Akturk, Oya Ekin Karasan

*المؤلف المقابل لهذا العمل

نتاج البحث: Conference contribution

1 اقتباس (Scopus)

ملخص

In this study, a three-machine flexible robotic manufacturing cell in which the CNC machines are used is considered. These machines are highly flexible and are capable of performing several different operations. Each machine is assumed to be capable of performing all of the required operations of each part. As a consequence of this assumption, a new class of cycles is defined and three simple and widely used cycles among this class is proposed. The regions of optimality for these cycles as well as the worst case performances are derived.

اللغة الأصليةEnglish
عنوان منشور المضيف12th IFAC Symposium on Information Control Problems in Manufacturing, INCOM 2006, and Associated Industrial Meetings
العنوان الفرعي لمنشور المضيفEMM'2006, BPM'2006, JT'2006
ناشرIFAC Secretariat
طبعةPART 1
رقم المعيار الدولي للكتب (المطبوع)9783902661043
المعرِّفات الرقمية للأشياء
حالة النشرPublished - 2006
منشور خارجيًانعم

سلسلة المنشورات

الاسمIFAC Proceedings Volumes (IFAC-PapersOnline)
الرقمPART 1
مستوى الصوت12
رقم المعيار الدولي للدوريات (المطبوع)1474-6670

ASJC Scopus subject areas

  • ???subjectarea.asjc.2200.2207???

بصمة

أدرس بدقة موضوعات البحث “Scheduling in a three-machine flexible robotic cell'. فهما يشكلان معًا بصمة فريدة.

قم بذكر هذا