Abstract
The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade: improved RPC in stations RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.
Original language | English |
---|---|
Article number | C10025 |
Journal | Journal of Instrumentation |
Volume | 15 |
Issue number | 10 |
DOIs | |
Publication status | Published - Oct 2020 |
Keywords
- Muon spectrometers
- Resistive-plate chambers
ASJC Scopus subject areas
- Instrumentation
- Mathematical Physics
Access to Document
Other files and links
Cite this
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS
CMS RPC activities during LHC LS-2. / Shah, M. A.; El Sawy, M.; Samalan, A. et al.
In: Journal of Instrumentation, Vol. 15, No. 10, C10025, 10.2020.Research output: Contribution to journal › Article › peer-review
}
TY - JOUR
T1 - CMS RPC activities during LHC LS-2
AU - Shah, M. A.
AU - El Sawy, M.
AU - Samalan, A.
AU - Tytgat, M.
AU - Zaganidis, N.
AU - Alves, G. A.
AU - Marujo, F.
AU - Da Silva De Araujo, F. Torres
AU - Da Costa, E. M.
AU - De Jesus Damiao, D.
AU - Nogima, H.
AU - Santoro, A.
AU - De Souza, S. Fonseca
AU - Aleksandrov, A.
AU - Hadjiiska, R.
AU - Iaydjiev, P.
AU - Rodozov, M.
AU - Shopova, M.
AU - Soultanov, G.
AU - Bonchev, M.
AU - Dimitrov, A.
AU - Litov, L.
AU - Pavlov, B.
AU - Petkov, P.
AU - Petrov, A.
AU - Qian, S. J.
AU - Bernal, C.
AU - Cabrera, A.
AU - Fraga, J.
AU - Sarkar, A.
AU - Elsayed, S.
AU - Assran, Y.
AU - Mahmoud, M. A.
AU - Mohammed, Y.
AU - Combaret, C.
AU - Gouzevitch, M.
AU - Grenier, G.
AU - Laktineh, I.
AU - Mirabito, L.
AU - Shchablo, K.
AU - Bagaturia, I.
AU - Lomidze, D.
AU - Lomidze, I.
AU - Bhatnagar, V.
AU - Gupta, R.
AU - Kumari, P.
AU - Singh, J.
AU - Amoozegar, V.
AU - Boghrati, B.
AU - Ebraimi, M.
AU - Ghasemi, R.
AU - Najafabadi, M. Mohammadi
AU - Zareian, E.
AU - Abbrescia, M.
AU - Aly, R.
AU - Elmetenawee, W.
AU - De Filippis, N.
AU - Franco, M.
AU - Gelmi, A.
AU - Iaselli, G.
AU - Lacalamita, N.
AU - Leszki, S.
AU - Loddo, F.
AU - Margjeka, I.
AU - Pugliese, G.
AU - Ramos, D.
AU - Caponero, M.
AU - Benussi, L.
AU - Bianco, S.
AU - Colafranceschi, S.
AU - Russo, A.
AU - Passamonti, L.
AU - Piccolo, D.
AU - Pierluigi, D.
AU - Saviano, G.
AU - Buontempo, S.
AU - Di Crescenzo, A.
AU - Fienga, F.
AU - De Lellis, G.
AU - Lista, L.
AU - Meola, S.
AU - Paolucci, P.
AU - Braghieri, A.
AU - Salvini, P.
AU - Montagna, P.
AU - Riccardi, C.
AU - Vitulo, P.
AU - Francois, B.
AU - Kim, T. J.
AU - Park, J.
AU - Choi, S. Y.
AU - Hong, B.
AU - Lee, K. S.
AU - Goh, J.
AU - Lee, H.
AU - Eysermans, J.
AU - Estrada, C. Uribe
AU - Pedraza, I.
AU - Castilla-Valdez, H.
AU - Sanchez-Hernandez, A.
AU - Herrera, C. A.Mondragon
AU - Navarro, D. A.Perez
AU - Sanchez, G. A.Ayala
AU - Carrillo, S.
AU - Vazquez, E.
AU - Radi, A.
AU - Ahmad, A.
AU - Asghar, I.
AU - Hoorani, H.
AU - Muhammad, S.
AU - Crotty, I.
N1 - Publisher Copyright: © 2020 IOP Publishing Ltd and Sissa Medialab.
PY - 2020/10
Y1 - 2020/10
N2 - The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade: improved RPC in stations RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.
AB - The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade: improved RPC in stations RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.
KW - Muon spectrometers
KW - Resistive-plate chambers
UR - http://www.scopus.com/inward/record.url?scp=85094950021&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85094950021&partnerID=8YFLogxK
U2 - 10.1088/1748-0221/15/10/C10025
DO - 10.1088/1748-0221/15/10/C10025
M3 - Article
AN - SCOPUS:85094950021
VL - 15
JO - Journal of Instrumentation
JF - Journal of Instrumentation
SN - 1748-0221
IS - 10
M1 - C10025
ER -