Calibration of MEPDG permanent deformation models using Hamburg Wheel Rut Tester and field data: Calibration of MEPDG permanent deformation models using Hamburg Wheel Rut Tester and field data

Research output: Contribution to journalArticlepeer-review

8 Citations (Scopus)

Abstract

This paper presents a new approach for calibration of Mechanistic-Empirical Pavement Design Guide
(MEPDG) permanent deformation models using the Hamburg Wheel Rut Tester (HWRT) Data. The
approach was applied on two Ontario mixes tested in HWRT to calibrate and validate the asphalt
concrete (AC) rut models. Data from one Long-Term Pavement Performance (LTPP) programme test
section in Ontario were also used for verification, calibration and validation of the AC and unbound
pavement layer rut models. The section had two construction (CN) life spans, one before milling and
overlay (CN1) and one after (CN2). The study used two finite element models and an Excel VBA sheet
to run the verification, calibration and validation of the MEPDG rut models. Proposed calibration
coefficients resulted in significant reduction in bias, sum of squared errors (SSE) and standard error of
estimate (SEE) for rutting by at least 91% for the two HWRT mixes and by at least 67% for CN1 and
CN2, when compared with the global and Ontario local calibration coefficients. The results support
the conclusion that the approach of using laboratory wheel tracking device data for calibrating the
MEPDG rut models is promising.
Original languageEnglish
Pages (from-to)1
Number of pages16
JournalInternational Journal of Pavement Engineering
Volume23
Issue number12
DOIs
Publication statusPublished - Jun 11 2021

Keywords

  • Calibration
  • MEPDG
  • permanent deformation
  • HWRT
  • Ontario

Cite this