Stochastic communication delay analysis of adaptive wormhole-switched routings in tori with faults

Farshad Safaei*, Mahmood Fathy, Ahmad Khonsari, Mohamed Ould-Khaoua

*المؤلف المقابل لهذا العمل

نتاج البحث: Conference contribution

ملخص

This paper proposes a novel analytical modeling approach to investigate the performance of five prominent adaptive routings in wormhole-switched 2-D tori fortified with an effective scheme suggested by Chalasani and Boppana [1], as an instance of a fault-tolerant method. This scheme has been widely used in the literature to achieve high adaptivity and support inter-processor communications in parallel computers due to its ability to preserve both communication performance and fault-tolerant demands in such networks. Analytical results of the model are confirmed by comparing with those obtained through simulation experiments.

اللغة الأصليةEnglish
عنوان منشور المضيفParallel and Distributed Processing and Applications - 5th International Symposium, ISPA 2007, Proceedingsq
ناشرSpringer Verlag
الصفحات497-508
عدد الصفحات12
رقم المعيار الدولي للكتب (المطبوع)3540747419, 9783540747413
المعرِّفات الرقمية للأشياء
حالة النشرPublished - 2007
منشور خارجيًانعم
الحدث5th International Symposium on Parallel and Distributed Processing and Applications, ISPA 2007 - Niagara Falls, Canada
المدة: أغسطس ٢٩ ٢٠٠٧أغسطس ٣١ ٢٠٠٧

سلسلة المنشورات

الاسمLecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
مستوى الصوت4742 LNCS
رقم المعيار الدولي للدوريات (المطبوع)0302-9743
رقم المعيار الدولي للدوريات (الإلكتروني)1611-3349

Other

Other5th International Symposium on Parallel and Distributed Processing and Applications, ISPA 2007
الدولة/الإقليمCanada
المدينةNiagara Falls
المدة٨/٢٩/٠٧٨/٣١/٠٧

ASJC Scopus subject areas

  • ???subjectarea.asjc.2600.2614???
  • ???subjectarea.asjc.1700???

بصمة

أدرس بدقة موضوعات البحث “Stochastic communication delay analysis of adaptive wormhole-switched routings in tori with faults'. فهما يشكلان معًا بصمة فريدة.

قم بذكر هذا