The effort required in a design project not only impacts the final cost, but also the project lead-time. This paper presents a case study carried out with the collaboration of Pratt & Whitney Canada, a global leader in the design and manufacturing of aircraft engines. The study uses a parametric modeling approach for the purpose of design effort estimation of an integrated blade-rotor low-pressure compressor (IBR LPC) fan. Later the model is validated and is utilized for the estimation of the design effort. A sensitivity analysis is carried out and the impact of various factors considered in the parametric model is also discussed.

اللغة الأصليةEnglish
الصفحات (من إلى)303-319
عدد الصفحات17
دوريةDesign Studies
مستوى الصوت30
رقم الإصدار3
المعرِّفات الرقمية للأشياء
حالة النشرPublished - مايو 2009

ASJC Scopus subject areas

  • ???subjectarea.asjc.2200.2216???
  • ???subjectarea.asjc.1200.1201???
  • ???subjectarea.asjc.2200.2200???
  • ???subjectarea.asjc.3300.3300???
  • ???subjectarea.asjc.1700.1706???
  • ???subjectarea.asjc.1700.1702???

قم بذكر هذا