ملخص
The effort required in a design project not only impacts the final cost, but also the project lead-time. This paper presents a case study carried out with the collaboration of Pratt & Whitney Canada, a global leader in the design and manufacturing of aircraft engines. The study uses a parametric modeling approach for the purpose of design effort estimation of an integrated blade-rotor low-pressure compressor (IBR LPC) fan. Later the model is validated and is utilized for the estimation of the design effort. A sensitivity analysis is carried out and the impact of various factors considered in the parametric model is also discussed.
اللغة الأصلية | English |
---|---|
الصفحات (من إلى) | 303-319 |
عدد الصفحات | 17 |
دورية | Design Studies |
مستوى الصوت | 30 |
رقم الإصدار | 3 |
المعرِّفات الرقمية للأشياء | |
حالة النشر | Published - مايو 2009 |
ASJC Scopus subject areas
- ???subjectarea.asjc.2200.2216???
- ???subjectarea.asjc.1200.1201???
- ???subjectarea.asjc.2200.2200???
- ???subjectarea.asjc.3300.3300???
- ???subjectarea.asjc.1700.1706???
- ???subjectarea.asjc.1700.1702???