CMS RPC commissioning of the existing detector during the long shutdown

A. Cimmino*, Y. Ban, J. Cai, Q. Li, S. Liu, S. Qian, D. Wang, Z. Xu, F. Zhang, Y. Choi, D. Kim, J. Goh, S. Choi, B. Hong, J. W. Kang, M. Kang, J. H. Kwon, K. S. Lee, S. K. Lee, S. K. ParkL. M. Pant, A. K. Mohanty, R. Chudasama, J. B. Singh, V. Bhatnagar, A. Mehta, R. Kumar, S. Cauwenbergh, S. Costantini, S. Crucy, A. Fagot, G. Garcia, A. Ocampo, D. Poyraz, S. Salva, F. Thyssen, M. Tytgat, N. Zaganidis, W. V. Doninck, A. Cabrera, L. Chaparro, J. P. Gomez, B. Gomez, J. C. Sanabria, C. Avila, A. Ahmad, S. Muhammad, M. Shoaib, H. Hoorani, A. Radi, CMS Collaboration

*المؤلف المقابل لهذا العمل

نتاج البحث: المساهمة في مجلةArticleمراجعة النظراء

ملخص

February 14th 2013 marked the end of the first period of running of the Large Hadron Collider (LHC) and the start of a two-year break from operation (LS1) aimed at consolidating both the accelerator as well as the detectors. By the end of LS1, the LHC is expected to provide collisions at 13 Tev. While, by 2020, the ultimate instantaneous luminosity is expected to be 1034/cm2/s. To prepare for this scenario, the Resistive Plate Chamber system at the CMS experiment is planning several detector maintainance and consolidation interventions. These include High Voltage and Low Voltage system reparations, gas leak identification and reparation, signal channel connectivity and functionality. Commissioning and upgrade plans for the existing CMS RPC system are presented here.

اللغة الأصليةEnglish
رقم المقالC10043
دوريةJournal of Instrumentation
مستوى الصوت9
رقم الإصدار10
المعرِّفات الرقمية للأشياء
حالة النشرPublished - أكتوبر 1 2014

ASJC Scopus subject areas

  • ???subjectarea.asjc.3100.3105???
  • ???subjectarea.asjc.2600.2610???

بصمة

أدرس بدقة موضوعات البحث “CMS RPC commissioning of the existing detector during the long shutdown'. فهما يشكلان معًا بصمة فريدة.

قم بذكر هذا