ملخص
The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade: improved RPC in stations RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.
اللغة الأصلية | English |
---|---|
رقم المقال | C10025 |
دورية | Journal of Instrumentation |
مستوى الصوت | 15 |
رقم الإصدار | 10 |
المعرِّفات الرقمية للأشياء | |
حالة النشر | Published - أكتوبر 2020 |
ASJC Scopus subject areas
- ???subjectarea.asjc.3100.3105???
- ???subjectarea.asjc.2600.2610???
الوصول إلى المستند
الملفات والروابط الأخرى
قم بذكر هذا
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS
CMS RPC activities during LHC LS-2. / Shah, M. A.; El Sawy, M.; Samalan, A. وآخرون.
في: Journal of Instrumentation, المجلد 15, رقم 10, C10025, ١٠.٢٠٢٠.نتاج البحث: المساهمة في مجلة › Article › مراجعة النظراء
}
TY - JOUR
T1 - CMS RPC activities during LHC LS-2
AU - Shah, M. A.
AU - El Sawy, M.
AU - Samalan, A.
AU - Tytgat, M.
AU - Zaganidis, N.
AU - Alves, G. A.
AU - Marujo, F.
AU - Da Silva De Araujo, F. Torres
AU - Da Costa, E. M.
AU - De Jesus Damiao, D.
AU - Nogima, H.
AU - Santoro, A.
AU - De Souza, S. Fonseca
AU - Aleksandrov, A.
AU - Hadjiiska, R.
AU - Iaydjiev, P.
AU - Rodozov, M.
AU - Shopova, M.
AU - Soultanov, G.
AU - Bonchev, M.
AU - Dimitrov, A.
AU - Litov, L.
AU - Pavlov, B.
AU - Petkov, P.
AU - Petrov, A.
AU - Qian, S. J.
AU - Bernal, C.
AU - Cabrera, A.
AU - Fraga, J.
AU - Sarkar, A.
AU - Elsayed, S.
AU - Assran, Y.
AU - Mahmoud, M. A.
AU - Mohammed, Y.
AU - Combaret, C.
AU - Gouzevitch, M.
AU - Grenier, G.
AU - Laktineh, I.
AU - Mirabito, L.
AU - Shchablo, K.
AU - Bagaturia, I.
AU - Lomidze, D.
AU - Lomidze, I.
AU - Bhatnagar, V.
AU - Gupta, R.
AU - Kumari, P.
AU - Singh, J.
AU - Amoozegar, V.
AU - Boghrati, B.
AU - Ebraimi, M.
AU - Ghasemi, R.
AU - Najafabadi, M. Mohammadi
AU - Zareian, E.
AU - Abbrescia, M.
AU - Aly, R.
AU - Elmetenawee, W.
AU - De Filippis, N.
AU - Franco, M.
AU - Gelmi, A.
AU - Iaselli, G.
AU - Lacalamita, N.
AU - Leszki, S.
AU - Loddo, F.
AU - Margjeka, I.
AU - Pugliese, G.
AU - Ramos, D.
AU - Caponero, M.
AU - Benussi, L.
AU - Bianco, S.
AU - Colafranceschi, S.
AU - Russo, A.
AU - Passamonti, L.
AU - Piccolo, D.
AU - Pierluigi, D.
AU - Saviano, G.
AU - Buontempo, S.
AU - Di Crescenzo, A.
AU - Fienga, F.
AU - De Lellis, G.
AU - Lista, L.
AU - Meola, S.
AU - Paolucci, P.
AU - Braghieri, A.
AU - Salvini, P.
AU - Montagna, P.
AU - Riccardi, C.
AU - Vitulo, P.
AU - Francois, B.
AU - Kim, T. J.
AU - Park, J.
AU - Choi, S. Y.
AU - Hong, B.
AU - Lee, K. S.
AU - Goh, J.
AU - Lee, H.
AU - Eysermans, J.
AU - Estrada, C. Uribe
AU - Pedraza, I.
AU - Castilla-Valdez, H.
AU - Sanchez-Hernandez, A.
AU - Herrera, C. A.Mondragon
AU - Navarro, D. A.Perez
AU - Sanchez, G. A.Ayala
AU - Carrillo, S.
AU - Vazquez, E.
AU - Radi, A.
AU - Ahmad, A.
AU - Asghar, I.
AU - Hoorani, H.
AU - Muhammad, S.
AU - Crotty, I.
N1 - Publisher Copyright: © 2020 IOP Publishing Ltd and Sissa Medialab.
PY - 2020/10
Y1 - 2020/10
N2 - The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade: improved RPC in stations RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.
AB - The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade: improved RPC in stations RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.
KW - Muon spectrometers
KW - Resistive-plate chambers
UR - http://www.scopus.com/inward/record.url?scp=85094950021&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85094950021&partnerID=8YFLogxK
U2 - 10.1088/1748-0221/15/10/C10025
DO - 10.1088/1748-0221/15/10/C10025
M3 - Article
AN - SCOPUS:85094950021
SN - 1748-0221
VL - 15
JO - Journal of Instrumentation
JF - Journal of Instrumentation
IS - 10
M1 - C10025
ER -