CMS RPC activities during LHC LS-2

M. A. Shah*, M. El Sawy, A. Samalan, M. Tytgat, N. Zaganidis, G. A. Alves, F. Marujo, F. Torres Da Silva De Araujo, E. M. Da Costa, D. De Jesus Damiao, H. Nogima, A. Santoro, S. Fonseca De Souza, A. Aleksandrov, R. Hadjiiska, P. Iaydjiev, M. Rodozov, M. Shopova, G. Soultanov, M. BonchevA. Dimitrov, L. Litov, B. Pavlov, P. Petkov, A. Petrov, S. J. Qian, C. Bernal, A. Cabrera, J. Fraga, A. Sarkar, S. Elsayed, Y. Assran, M. A. Mahmoud, Y. Mohammed, C. Combaret, M. Gouzevitch, G. Grenier, I. Laktineh, L. Mirabito, K. Shchablo, I. Bagaturia, D. Lomidze, I. Lomidze, V. Bhatnagar, R. Gupta, P. Kumari, J. Singh, V. Amoozegar, B. Boghrati, M. Ebraimi, R. Ghasemi, M. Mohammadi Najafabadi, E. Zareian, M. Abbrescia, R. Aly, W. Elmetenawee, N. De Filippis, M. Franco, A. Gelmi, G. Iaselli, N. Lacalamita, S. Leszki, F. Loddo, I. Margjeka, G. Pugliese, D. Ramos, M. Caponero, L. Benussi, S. Bianco, S. Colafranceschi, A. Russo, L. Passamonti, D. Piccolo, D. Pierluigi, G. Saviano, S. Buontempo, A. Di Crescenzo, F. Fienga, G. De Lellis, L. Lista, S. Meola, P. Paolucci, A. Braghieri, P. Salvini, P. Montagna, C. Riccardi, P. Vitulo, B. Francois, T. J. Kim, J. Park, S. Y. Choi, B. Hong, K. S. Lee, J. Goh, H. Lee, J. Eysermans, C. Uribe Estrada, I. Pedraza, H. Castilla-Valdez, A. Sanchez-Hernandez, C. A.Mondragon Herrera, D. A.Perez Navarro, G. A.Ayala Sanchez, S. Carrillo, E. Vazquez, A. Radi, A. Ahmad, I. Asghar, H. Hoorani, S. Muhammad, I. Crotty

*المؤلف المقابل لهذا العمل

نتاج البحث: المساهمة في مجلةArticleمراجعة النظراء

1 اقتباس (Scopus)

ملخص

The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade: improved RPC in stations RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.

اللغة الأصليةEnglish
رقم المقالC10025
دوريةJournal of Instrumentation
مستوى الصوت15
رقم الإصدار10
المعرِّفات الرقمية للأشياء
حالة النشرPublished - أكتوبر 2020

ASJC Scopus subject areas

  • ???subjectarea.asjc.3100.3105???
  • ???subjectarea.asjc.2600.2610???

قم بذكر هذا