Bayesian hierarchical modeling of latent period switching in small-area putative health hazard studies

Ahmed Al-Hadhrami*, Andrew B. Lawson

*المؤلف المقابل لهذا العمل

نتاج البحث: المساهمة في مجلةArticleمراجعة النظراء

2 اقتباسات (Scopus)

ملخص

In recent years, small area risk assessment modelling and data analysis around putative hazard sources has become a fundamental part of public health and environmental sciences. In this study, we address a fundamental problem in the analysis of such data, when intermittent operation of facilities could lead to evidence for latent periods of risk. This study examines the development of Bayesian models for the latent switching operating period of putative hazard sources such as nuclear processing plants and waste disposal incinerators. The developed methodology is applied in a simulation study as well as to a real data example.

اللغة الأصليةEnglish
الصفحات (من إلى)5-28
عدد الصفحات24
دوريةStatistical Methods in Medical Research
مستوى الصوت20
رقم الإصدار1
المعرِّفات الرقمية للأشياء
حالة النشرPublished - فبراير 2011
منشور خارجيًانعم

ASJC Scopus subject areas

  • ???subjectarea.asjc.2700.2713???
  • ???subjectarea.asjc.2600.2613???
  • ???subjectarea.asjc.3600.3605???

بصمة

أدرس بدقة موضوعات البحث “Bayesian hierarchical modeling of latent period switching in small-area putative health hazard studies'. فهما يشكلان معًا بصمة فريدة.

قم بذكر هذا