TY - JOUR
T1 - Application of fuzzy TOPSIS framework for selecting complex project in a case company
AU - Shamsuzzoha, Ahm
AU - Piya, Sujan
AU - Shamsuzzaman, Mohammad
N1 - Publisher Copyright:
© 2021, Ahm Shamsuzzoha, Sujan Piya and Mohammad Shamsuzzaman.
PY - 2021
Y1 - 2021
N2 - Purpose: This study aims to propose a method known as the fuzzy technique for order preference by similarity to ideal solution (fuzzy TOPSIS) for complex project selection in organizations. To fulfill study objectives, the factors responsible for making a project complex are collected through literature review, which is then analyzed by fuzzy TOPSIS, based on three decision-makers’ opinions. Design/methodology/approach: The selection of complex projects is a multi-criteria decision-making (MCDM) process for global organizations. Traditional procedures for selecting complex projects are not adequate due to the limitations of linguistic assessment. To crossover such limitation, this study proposes the fuzzy MCDM method to select complex projects in organizations. Findings: A large-scale engine manufacturing company, engaged in the energy business, is studied to validate the suitability of the fuzzy TOPSIS method and rank eight projects of the case company based on project complexity. Out of these eight projects, the closeness coefficient of the most complex project is found to be 0.817 and that of the least complex project is found to be 0.274. Finally, study outcomes are concluded in the conclusion section, along with study limitations and future works. Research limitations/implications: The outcomes from this research may not be generalized sufficiently due to the subjectivity of the interviewers. The study outcomes support project managers to optimize their project selection processes, especially to select complex projects. The presented methodology can be used extensively used by the project planners/managers to find the driving factors related to project complexity. Originality/value: The presented study deliberately explained how complex projects in an organization could be select efficiently. This selection methodology supports top management to maintain their proposed projects with optimum resource allocations and maximum productivity.
AB - Purpose: This study aims to propose a method known as the fuzzy technique for order preference by similarity to ideal solution (fuzzy TOPSIS) for complex project selection in organizations. To fulfill study objectives, the factors responsible for making a project complex are collected through literature review, which is then analyzed by fuzzy TOPSIS, based on three decision-makers’ opinions. Design/methodology/approach: The selection of complex projects is a multi-criteria decision-making (MCDM) process for global organizations. Traditional procedures for selecting complex projects are not adequate due to the limitations of linguistic assessment. To crossover such limitation, this study proposes the fuzzy MCDM method to select complex projects in organizations. Findings: A large-scale engine manufacturing company, engaged in the energy business, is studied to validate the suitability of the fuzzy TOPSIS method and rank eight projects of the case company based on project complexity. Out of these eight projects, the closeness coefficient of the most complex project is found to be 0.817 and that of the least complex project is found to be 0.274. Finally, study outcomes are concluded in the conclusion section, along with study limitations and future works. Research limitations/implications: The outcomes from this research may not be generalized sufficiently due to the subjectivity of the interviewers. The study outcomes support project managers to optimize their project selection processes, especially to select complex projects. The presented methodology can be used extensively used by the project planners/managers to find the driving factors related to project complexity. Originality/value: The presented study deliberately explained how complex projects in an organization could be select efficiently. This selection methodology supports top management to maintain their proposed projects with optimum resource allocations and maximum productivity.
KW - Both
KW - Case study
KW - Complex projects selection
KW - Expert opinions
KW - Fuzzy TOPSIS
KW - Multi-criteria decision-making
UR - http://www.scopus.com/inward/record.url?scp=85107754518&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85107754518&partnerID=8YFLogxK
U2 - 10.1108/JGOSS-07-2020-0040
DO - 10.1108/JGOSS-07-2020-0040
M3 - Article
AN - SCOPUS:85107754518
SN - 1753-8297
VL - 14
SP - 528
EP - 566
JO - Journal of Global Operations and Strategic Sourcing
JF - Journal of Global Operations and Strategic Sourcing
IS - 3
ER -