Application of fuzzy TOPSIS framework for selecting complex project in a case company

Ahm Shamsuzzoha*, Sujan Piya, Mohammad Shamsuzzaman

*المؤلف المقابل لهذا العمل

نتاج البحث: المساهمة في مجلةArticleمراجعة النظراء

19 اقتباسات (Scopus)

ملخص

Purpose: This study aims to propose a method known as the fuzzy technique for order preference by similarity to ideal solution (fuzzy TOPSIS) for complex project selection in organizations. To fulfill study objectives, the factors responsible for making a project complex are collected through literature review, which is then analyzed by fuzzy TOPSIS, based on three decision-makers’ opinions. Design/methodology/approach: The selection of complex projects is a multi-criteria decision-making (MCDM) process for global organizations. Traditional procedures for selecting complex projects are not adequate due to the limitations of linguistic assessment. To crossover such limitation, this study proposes the fuzzy MCDM method to select complex projects in organizations. Findings: A large-scale engine manufacturing company, engaged in the energy business, is studied to validate the suitability of the fuzzy TOPSIS method and rank eight projects of the case company based on project complexity. Out of these eight projects, the closeness coefficient of the most complex project is found to be 0.817 and that of the least complex project is found to be 0.274. Finally, study outcomes are concluded in the conclusion section, along with study limitations and future works. Research limitations/implications: The outcomes from this research may not be generalized sufficiently due to the subjectivity of the interviewers. The study outcomes support project managers to optimize their project selection processes, especially to select complex projects. The presented methodology can be used extensively used by the project planners/managers to find the driving factors related to project complexity. Originality/value: The presented study deliberately explained how complex projects in an organization could be select efficiently. This selection methodology supports top management to maintain their proposed projects with optimum resource allocations and maximum productivity.

اللغة الأصليةEnglish
الصفحات (من إلى)528-566
عدد الصفحات39
دوريةJournal of Global Operations and Strategic Sourcing
مستوى الصوت14
رقم الإصدار3
المعرِّفات الرقمية للأشياء
حالة النشرPublished - 2021

ASJC Scopus subject areas

  • ???subjectarea.asjc.1400.1408???
  • ???subjectarea.asjc.1800.1803???
  • ???subjectarea.asjc.1400.1407???

بصمة

أدرس بدقة موضوعات البحث “Application of fuzzy TOPSIS framework for selecting complex project in a case company'. فهما يشكلان معًا بصمة فريدة.

قم بذكر هذا