Unlike building a new project, the maintenance and rehabilitation of an existing project are complex. The complexity is driven by different factors such as limited access to the site, limited working hours, restricted storage area, a limited number of allowed crews to work simultaneously, etc. Considering all of these factors is essential for construction process planning. Hence, testing the maintenance project under different project scenarios will help to identify the optimum resources configuration. In this paper, we present a case study of a maintenance project located in Al Khodh, Oman. It is required to model and simulate the maintenance operation, given many client-based work constraints. The project was modelled using a Simphony simulation environment. The simulation model was tested in different resource configurations, including several floor accesses, other tiles breaking and tiles installation teams, and a different number of waterproofing teams. This study demonstrated that the tiles installation team is the most influencing resource in the project. Given one floor access at a time and using two tiles installation produces the most economical resources configuration. Three tiles installation teams are the best selection for two-floor accesses, and seven tiles installation teams selection is best for three floors.

العنوان المترجم للمساهمةدراسة حالة SIMPHONY نمذجة واختبار مشروع صیانة باستخدام مبارك العلوي* ومحمد الشحري وزینب بقال
اللغة الأصليةEnglish
الصفحات (من إلى)13-21
عدد الصفحات9
دوريةJournal of Engineering Research
مستوى الصوت19
رقم الإصدار1
المعرِّفات الرقمية للأشياء
حالة النشرPublished - مارس 31 2022

Keywords

  • Construction operation
  • Discrete event simulation
  • Maintenance project
  • Simphony
  • Simulation

ASJC Scopus subject areas

  • ???subjectarea.asjc.2200.2200???

بصمة

أدرس بدقة موضوعات البحث “دراسة حالة SIMPHONY نمذجة واختبار مشروع صیانة باستخدام مبارك العلوي* ومحمد الشحري وزینب بقال: CASESTUDY'. فهما يشكلان معًا بصمة فريدة.

قم بذكر هذا